Frazier Concrete completes 464,203 SF tilt-up project for Prologis | 18 Jan 2015 |
Frazier is proud to partner with TWC Construction, Inc. to deliver Las Vegas Corporate Center #19, the largest industrial space development since the recession in North Las Vegas to project owner Prologis, the global leader in industrial logistics real estate. Frazier placed 464,203 SF of slab-on-grade in just 8 placements, with the largest being 72,000 SF in a single pour. Frazier safely erected the 131+ panel building in 40 hours, the tallest panel being 51’, the heaviest 199,000 lbs. View highlights of the slab-on-grade placement and tilt-up wall erection process. |
|
|
Frazier Masonry was timely, professional and cost-effective. Thank you for being a part of this project. I look forward to working with you again in the future.
- Amer Soudani - P.E. - Parking Structure Builders Inc.
|
|
|