Frazier’s Concrete Division erects 56 tilt-up panels in 11 hours

30 Nov 2011

At the NW Satellite Transport Facility in North Las Vegas, Frazier’s Concrete Division safely erected the 41,000 SF, 56-panel, main building facility in 11 eleven hours flat. The 44,500 SF project consists of the main building, bus wash, generator enclosure and trash enclosure with a total of 81 tilt-up panels, the tallest panel being 33’-1”, the heaviest 80,000 lbs. View images of the building erection process here.


Mercedes Benz - Valencia, CA
Frazier's performance has exceeded our expectations by meeting our tight schedule, delivering a quality product, and coordinating their work with other trades and interferences. We are hoping to continue our successful relationship with Frazier Masonry and hope to see them on our next project.
- Frank E. Smith - Senior Project Manager - ET Environmental


About FMC    |    Services    |    Contact Us    |    Employment    |    Admin
Copyright © 20015 Frazier Masonry Corporation. All rights reserved.